Delighted to share pictures of a recent pipework factory upgrade.

Following the upgrade the system can now supply water at the correct pressure.

As a result, product testing can now be conducted at the required rate, and the machine is operating at 100% efficiency.

Take advantage of a free site survey today for your very own system upgrade.

service@cougar-industries.co.uk

01442 860000

©2024

Share