



Delighted to share pictures of a recent pipework factory upgrade.
Following the upgrade the system can now supply water at the correct pressure.
As a result, product testing can now be conducted at the required rate, and the machine is operating at 100% efficiency.
Take advantage of a free site survey today for your very own system upgrade.
service@cougar-industries.co.uk
01442 860000
©2024